Seacrest Estate
Sandy Beach
Completed in 2013, this project included mass planting, turf and mulch areas, concrete footpaths, stone retaining walls, picnic shelters, informal playground, drainage swales, planting of street trees and ongoing maintenance. Incorporated in this project was the mass planting of a water retention basin for environmental rehabilitation. 
Specialist Medical Centre
Coffs Harbour
Completed in 2012, this project saw the creation of lush gardens bordered by concrete edging, turf instillation, the mass planting of the drainage swale and the plant out of the car park water retention basins.   
Les Christian Lodge Aged Care Facility
Raleigh
Completed in 2013, this project consisted of the instillation of three concrete crib retaining walls varying from 1.8 to 5 meters in height and filled with ballast rock from Valla Quarry.  
Bellingen Council Project 
Bellingen 
Completed in 2013, this project involved the removal of the existing retaining wall and the instillation of a concrete crib retaining wall and timber fence. 
The Haven Aged Care Facility Coffs Harbour
Completed in 2009, this project included the construction of charcoal stack block retaining walls throughout the facility, along with the addition of gardens, turf and the instillation of an irrigation system. 